Silicon carbide semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8686436
SERIAL NO

13600532

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a semiconductor device includes a first semiconductor region, a second semiconductor region, a third semiconductor region, a fourth semiconductor region, an insulating film, a control electrode, a first electrode, and a second electrode. The first semiconductor region includes silicon carbide, and has a first portion. The second semiconductor region is provided on the first semiconductor region, and includes silicon carbide. The third semiconductor region and the fourth semiconductor region are provided on the second semiconductor region, and includes silicon carbide. The electrode is provided on the film. The second semiconductor region has a first region and a second region. The first region contacts with the third semiconductor region and the fourth semiconductor region. The second region contacts with the first portion. The impurity concentration of the first region is higher than an impurity concentration of the second region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kono, Hiroshi Kanagawa-ken, JP 97 721
Nishio, Johji Tokyo, JP 90 1267
Shinohe, Takashi Kanagawa-ken, JP 168 1544
Suzuki, Takuma Kanagawa-ken, JP 68 361

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00