Substrate treating apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10186427
APP PUB NO 20180096856A1
SERIAL NO

15833184

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate treating apparatus and a method of treating a substrate, the apparatus including a substrate treater that treats a substrate using a chemical solution, the chemical solution including a phosphoric acid aqueous solution and a silicon compound; and a chemical solution supplier that supplies the chemical solution to the substrate treating unit, wherein the chemical solution supplier includes a concentration measurer that measures concentrations of the chemical solutions, the concentration measurer including a first concentration measurer that measures a water concentration of the chemical solution; and a second concentration measurer that measures a silicon concentration of the chemical solution.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Ingi Hwaseong-si, KR 15 19
Kim, Kyoung Hwan Yongin-si, KR 29 88
Kim, Young-Hoo Yongin-si, KR 47 1763
Lee, Hyosan Hwaseong-si, KR 46 510
Lee, Kuntack Suwon-si, KR 62 845
Oh, Jung-Min Incheon, KR 67 417
Park, Mihyun Seongnam-si, KR 74 950
Park, Ui-soon Suwon-si, KR 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 22, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 22, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00