Open web composite shear connector construction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9518401
APP PUB NO 20150167289A1
SERIAL NO

14526009

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for constructing multi-story building is disclosed. The system can include a plurality of vertical beams and a base beam section. The base beam section can be supported horizontally between the plurality of vertical column members and can include a composite shear connector attached thereto. The framing system can further include a plurality of concrete plank sections spanning perpendicularly to, and supported by, either side of the base beam. The plurality of concrete plank sections can be assembled in pairs. The framing system can also include grout material applied to the composite shear connector and the concrete plank sections to fill the cavities of the assembly to provide an integral framing system. A method for assembling such a system is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
URBANTECH CONSULTING ENGINEERING PC11 BROADWAY SUITE 410 NEW YORK NY 10004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Wei New York, US 2513 15832

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00