Nitride semiconductor structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8188573
APP PUB NO 20100090312A1
SERIAL NO

12584942

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nitride semiconductor substrate and a method for manufacturing the same are provided. The nitride semiconductor substrate includes an epitaxy substrate, a nitride pillar layer, a nitride semiconductor layer, and a mask layer. The nitride pillar layer includes a plurality of first patterned arranged pillars and a plurality of second patterned arranged pillars. The nitride pillar layer is formed on the epitaxy substrate. A width of a cross-section of each of the second patterned arranged pillars is smaller than a width of a cross-section of each of the first patterned arranged pillars, and a distance among each of the second patterned arranged pillars is longer than a distance among each of the first patterned arranged pillars. Surfaces of the epitaxy substrate, the first patterned arranged pillars, and the second patterned arranged pillars are covered by the mask layer. The nitride semiconductor layer is formed on the nitride pillar layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INDUSTRIAL TECHNOLOGY RESEARCH INSTITUTE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Yih-Der Hsinchu, TW 23 275
Kuo, Wei-Hung Hsinchu, TW 27 365
Lin, Suh-Fang Hsinchu, TW 7 215

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2023
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00