Optoelectronic devices and methods of making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11462688
APP PUB NO 20200106019A1
SERIAL NO

16585843

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a device that includes a first layer that includes at least one of a semiconducting material, a hole transport material (HTM), and/or an electron transport material (ETM), a second layer, and a third layer that includes a material that is at least one of transparent or conductive, where the second layer is positioned between the first layer and the third layer, the first layer, the second layer, and the third layer are in electrical contact with each other, and the third layer has a first thickness between greater than zero nm and about 100 nm. In some embodiments of the present disclosure, the semiconducting material may include a perovskite.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ALLIANCE FOR SUSTAINABLE ENERGY LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berry, Joseph Jonathan Boulder, US 17 17
Leijtens, Tomas Emerald Hills, US 15 27
Moore, David Todd Lakewood, US 7 18
Palmstrom, Axel Finn Golden, US 6 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00