Mixed powder and sintered body, mixed cermet powder and cermet, and fabrication methods thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8303681
APP PUB NO 20100184582A1
SERIAL NO

12376737

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mixed powder and a sintered body obtained by sintering the mixed powder. The mixed powder includes a solid-solution powder with complete solid-solution phase. The solid-solution powder includes a carbide or a carbonitride of at least two metals selected, including Ti, from metals of Groups IVa, Va and VIa of the periodic table, or a mixture thereof. A mixed cermet powder and a cermet obtained by sintering the mixed cermet powder are also disclosed. The mixed cermet powder includes at least a cermet powder with complete solid-solution phase. The cermet powder includes a carbide or a carbonitride of at least two metals selected, including Ti, from metals of Groups IVa, Va and VIa of the periodic table, or a mixture thereof, and at least one metal selected from the group consisting of Ni, Co and Fe. Also disclosed are a sintered body and a fabrication method of a cermet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEOUL NATIONAL UNIVERSITY INDUSTRY FOUNDATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Jin-Kwan Cheonan-si, KR 9 134
Kang, Shin-Hoo Seoul, KR 2 1
Kwon, Han-Jung Nonsan-si, KR 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 6, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00