Multilayer wiring substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10249563
APP PUB NO 20170330828A1
SERIAL NO

15607757

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a multilayer wiring substrate capable of achieving excellent conduction reliability. The multilayer wiring substrate is formed by laminating an anisotropic conductive member including an insulating base which is made of an inorganic material, a plurality of conductive paths which are made of a conductive member, penetrate the insulating base in a thickness direction thereof and are provided in a mutually insulated state, and a pressure sensitive adhesive layer which is provided on a surface of the insulating base, in which each conductive path has a protrusion protruding from the surface of the insulating base, and a wiring substrate having a substrate and one or more electrodes to be formed on the substrate, and conductive paths which come into contact with the electrode among the plurality of conductive paths are deformed so that adjacent conductive paths come into contact with each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJIFILM CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hotta, Yoshinori Haibara-gun, JP 56 393
Kurooka, Shunji Haibara-gun, JP 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00