Reflection database architecture with state driven synchronization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11847138
APP PUB NO 20220284040A1
SERIAL NO

17194654

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments include systems and method for performing state driven bi-directional synchronization in a reflection database architecture. A set of changes to a series of data fields can be received at a first database, the set of changes being part of a first process flow. The first database can be a reflection of a second database over a partition. State driven synchronization can be performed by a bi-directional synchronization engine for at least a portion of the series of data fields between the first database and the second database. The bi-directional synchronization engine can be configured to bi-directionally synchronize data between the first database and the second database based at least in part on detecting a boundary state at one or more of the first database and the second database.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SMART SYSTEMS TECHNOLOGY, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Celli, Michelangelo Cherubini Greensburg, US 2 0
Hindman, David Thomas Belchertown, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00