Method and apparatus for determining extrudate flow in three-dimensional (3D) printing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11241836
APP PUB NO 20180297289A1
SERIAL NO

15949499

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An additive manufacturing apparatus, and corresponding method, determine a mass (or volume) output flow rate of extrudate used in three-dimensional (3D) printing, and such determination is insensitive to rheological properties of a material of the extrudate being printed. A thermal energy balance on a liquefying extrusion head enables a load on a heater, used to heat the extrusion head, to be related to the output flow rate of extrudate. Based on the thermal energy balance, the output flow rate may be determined based on a duty cycle of the heater. The output flow rate may be employed to affect the 3D printing to prevent over- or under-extrusion of the extrudate and to identify a fault condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DESKTOP METAL INC63 THIRD AVE BURLINGTON MA 01803

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barbati, Alexander C Cambridge, US 33 119
Myerberg, Jonah Samuel Lexington, US 86 1055

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00