Free fall simulator cooling system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11192040
SERIAL NO

16634817

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A free fall simulator comprising: a wind tunnel system; a flight chamber connected to the wind tunnel allowing for a continuous flow of circulating air, and a cooling system for cooling of the air circulating in the wind tunnel system, wherein the cooling system comprises: an air inlet sucking in a part of the air circulating in the wind tunnel system; at least one heat exchanger comprising a coolant; and at least one air outlet adapted such that the cooled air leaves the cooling system through the at least one air outlet. The cooling system further comprises: a closed pressure chamber comprising a cooling area having pressure higher than atmospheric pressure, and at least one auxiliary fan. The at least one heat exchanger is located inside of the closed pressure chamber so that the cooling of the circulating air takes place in the cooling area.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STROJIRNA LITVINOV SPOL S R O436 01 LITVINOV

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marsik, Tomas Litvinov, CZ 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00