System for controlling power consumption on a distribution grid

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11309734
APP PUB NO 20210175743A1
SERIAL NO

16758911

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

System for controlling power consumption on a portion of a distribution grid providing electrical power to a plurality of power-consuming units and including a substation providing one or more transformers operable to increase or decrease the voltage supplied to consumers within the portion of the grid. A data set includes a previously measured power consumption associated with previously measured values of (a) property(ies) being one of voltage, current, frequency or load, or a combination thereof. A measurement device for measuring the property(ies) of the grid. A processing device to determine from the previously measured values of the property(ies) a most likely effect of altering the value(s) of the property(ies) from a first value to a second value. A storage device for storing one or more rules associating a measured condition with a corrective action. The system being operable to determine whether a measurement meets a measured condition of a stored rule.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ELECTRICITY NORTH WEST PROPERTY LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cox, Steve Warrington, GB 24 753

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00