Multilateral junction having expanding metal sealed and anchored joints

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11668163
SERIAL NO

17137882

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a multilateral junction. The multilateral junction, in one aspect, includes a y-block. The multilateral junction additionally includes a mainbore leg coupled to the y-block, the mainbore leg defining a second overlapping space, and a lateral bore leg coupled to the y-block, the lateral bore leg defining a third overlapping space. The multilateral junction, in this aspect, additionally includes an expanded metal joint located in at least a portion of the second overlapping space or the third overlapping space, the expanded metal joint comprising a metal that has expanded in response to hydrolysis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asthana, Pranay Carrollton, US 11 17
Fripp, Michael Linley Carrollton, US 329 2435
Jelly, Christian Alexander Carrollton, US 6 11
Steele, David Joe Carrollton, US 97 518

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00