Vacuum pumping system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11839903
SERIAL NO

16608046

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vacuum pumping system which comprises a plurality of vacuum pumping arrangements for evacuating a flammable gas stream and exhausting the gas stream through an exhaust outlet. A housing houses the vacuum pumping arrangements and forms an air flow duct for an air flow for mixing with the exhaust gas stream output from the exhaust outlet in a mixing region in the housing. An airflow generator generates an air flow through the air flow duct to cause mixing of air with the flammable gas stream to a percentage of the flammable gas in the air flow lower than the lower flammability limit of the flammable gas. An airflow sensor senses the flow of air for determining if the air flow is sufficient to dilute the flammable gas to lower than said percentage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EDWARDS LIMITEDBURGESS HILL SUSSEX RH15 9TW

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bailey, Christopher Mark Burgess Hill, GB 21 32
Czerniak, Michael Roger Burgess Hill, GB 10 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00