Method and apparatus for processing radar data

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11275169
APP PUB NO 20200072957A1
SERIAL NO

16220552

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for processing radar data including predicting an angle-of-interest (AOI) region based on a Doppler map generated from radar data, adjusting steering information based on the predicted AOI region, the steering information being used to identify the radar data, and determining direction-of-arrival (DOA) information corresponding to the radar data based on the adjusted steering information. A radar data processing apparatus including a radar sensor to sense radar data and a processor to predict an (AOI) region based on a Doppler map generated from the radar data, to adjust steering information, which is used to identify the radar data, based on the predicted AOI region, and to determine DOA information corresponding to the radar data based on the adjusted steering information.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Sung Do Suwon-si, KR 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00