Display structure having a dam and gap

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11271185
APP PUB NO 20200274096A1
SERIAL NO

16614950

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display structure is provided. The display structure includes a substrate, a dam, a first film layer, a second film layer, and a third film layer. The third film layer has a first spread rate for the first film layer, the third film layer has a second spread rate for the second film layer, and the first spread rate is less than the second spread rate. The spread rates of the third film layer on the first and second film layers are different, so as to slow the spread rate of the third film layer near an area of the dam, thereby reducing the risk that the third film layer overflows the dam, so that the encapsulation reliability of the display structure can be improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • WUHAN CHINA STAR OPTOELECTRONICS SEMICONDUCTOR DISPLAY TECHNOLOGY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Kan Hubei, CN 48 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00