Ocular implant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12011391
SERIAL NO

17186803

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device implantable into the eye that includes an elongate duct portion defining two lumens that extend parallel to one another from a distal end to a neck spaced longitudinally from the distal end, a second portion including two tubular segments that extend or flare outwardly from the neck opposite one another with at least one additional tubular segment that extends between the two tubular segments such that the tubular segments of the second portion form a tubular loop that surrounds an interior area. The tubular segments of the second portion that form the tubular loop define a common lumen with a plurality of outlets that are in fluid communication with the two lumens of the duct portion to permit fluid to flow through the device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INNFOCUS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Yasushi Pedro Weston, US 6 221
Pinchuk, Leonard Miami, US 182 18620

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00