Display device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11243445
APP PUB NO 20200241370A1
SERIAL NO

16674039

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display device according to an exemplary embodiment of the present invention includes: a substrate; a gate line that is disposed on the substrate in a first direction; a data line that is disposed in a second direction, while crossing the gate line; a semiconductor layer that is disposed between the gate line and the data line, a transistor formed by the semiconductor, a part of the gate line, and a part of the data line; a pixel electrode connected with the transistor; and a light blocking member that is disposed on the pixel electrode, wherein the light blocking member is disposed in the second direction while overlapping the data line, the light blocking member includes a first region and a second region, each having a different width in the first direction, and a width of the second region is narrower than a width of the first region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG DISPLAY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Jae Bok Incheon, KR 5 9
Hong, Sung Hwan Suwon-si, KR 25 96
Lee, Jun Woo Seongnam-si, KR 67 200

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00