Integrated energy storage component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11581139
APP PUB NO 20210074477A1
SERIAL NO

16951353

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated energy storage component that includes a substrate supporting a contoured layer having a region with a contoured surface such as elongated pores. A stack structure is provided conformally over the contoured surface of this region. The stack is a single or repeated instance of MOIM layers, or MIOM layers, the M layers being metal layers, or a quasi-metal such as TiN, the O layers being oxide layers containing ions, and the I layer being an ionic dielectric. The regions having a contoured surface may be formed of porous anodized alumina.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MURATA MANUFACTURING CO LTD.; COMMISSARIAT A L' ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oukassi, Sami Paris, FR 46 142
Sallaz, Valentin Cran-Gevrier, FR 3 1
Salot, Raphaël Paris, FR 14 78
Voiron, Frédéric Barraux, FR 35 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00