Simulation device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11670186
SERIAL NO

17557088

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A simulation device includes an outer frame and an inner frame. The outer frame is fixed to a floor surface and the inner frame is slideably interfaced to the outer frame. The inner frame has an inner frame axis. A hydraulic cylinder is interfaced between the outer frame and the inner frame. Operation of the hydraulic cylinder slides the inner frame with respect to the outer frame along the inner frame axis. A yaw platform is interfaced to the inner frame at one end at a pivot and at a distal opposing end by two or more bearings. The yaw platform has a yaw platform axis. Operation of a yaw motor or a yaw hydraulic ram interfaced between the yaw platform and the inner frame causes the yaw platform to change an angle between the inner frame axis and the yaw platform axis, providing simulation of yaw (loss of control).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ADVANCED TRAINING SYSTEM LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mar, Enrique Fallbrook, US 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00