Transport platform including adapter elements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11492174
APP PUB NO 20210261292A1
SERIAL NO

17254925

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An adapter element and a transport platform, such as a dolly (1), including at least one such adapter element (5), said at least one adapter element (5) being connected or connectable to the dolly (1) and having a rim portion (6) protruding from a deck (2) of the dolly (1) for restraining loads placed on top of the deck (2) at least in a lateral direction, wherein the at least one adapter element (5) is provided with one or more legs (8, 12; 8, 12, 17,.18) each comprising an engagement portion (9, 13; 9;13, 19, 20), preferably tabs or protrusions, for being received and snap-fitted into a corresponding opening (10, 15) provided in the deck (2). An outer leg (12) of the one or more legs (8, 12; 8, 12, 17, 18) is formed as a tab or tongue having a through hole (13) which serves as an engagement portion of the outer leg (12).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CHEP TECHNOLOGY PTY LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cant, Malcolm Wokingham, GB 3 7
Huizingh, John AH Vlagtwedde, NL 9 8
Lopez, Uran Daniel London, GB 11 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00