Transfer of products between a transit zone and a collecting surface

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11767177
APP PUB NO 20210061582A1
SERIAL NO

16958163

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a transfer device for transferring products in an industrial processing line for the in-line processing of products, between a collecting surface and a transit zone running alongside the collecting surface, said transit zone comprising at least two longitudinal conveyors spaced away from a slider bed and each intended to transport a file of products, said device comprising said collecting surface, said transit zone, and a transfer tool transferring between the collecting surface and the transit zone, equipped with at least three longitudinal vertical walls, and intended to push, transversely, longitudinal rows of products which rows are each positioned between two walls. This device is wherein at least one wall of the transfer tool is mounted with the ability to move translationally on said tool in a transverse direction, for a movement of pushing said products. Other subjects of the invention are corresponding methods.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIDEL PARTICIPATIONS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berger, Julien Reichstett, FR 12 31
Gehin, Anthony Reichstett, FR 8 18
Petrovic, Zmaj Reichstett, FR 30 228

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00