Intelligent bill of materials advisor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11315201
APP PUB NO 20210224929A1
SERIAL NO

17022683

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system for intelligently generating Bill of Materials (BoM) and tracking components of a build site. The method and system include querying a knowledge graph for a collection of historical bill of materials (BoMs), automatically generating a digital twin of a built site based on a selected group of completed build site, and intelligently generating the BoM for the digital twin based on BoMs of the selected group of completed built site.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ACCENTURE GLOBAL SOLUTIONS LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amin, Unnati Voorhees, US 1 0
Bajaj, Nitin Overland Park, US 6 15
Chen, Michael Nai-An San Francisco, US 3 1
Combs, Trinidy Ray Minneapolis, US 1 0
Hernandez, Analiz Cabrera Somerville, US 1 0
Parthasarathy, Sonali San Francisco, US 8 167
Puri, Colin Anil Walnut Creek, US 22 438
Roberts, Steven Robert Burlingame, US 1 0
Shay, Elizabeth Ann San Francisco, US 1 0
Tung, Teresa Sheausan Tustin, US 68 794
Vasquez, Reymonrod Geli Vallejo, US 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00