Cross-domain featuring engineering

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11556837
APP PUB NO 20200210881A1
SERIAL NO

16233499

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The example embodiments are directed to a continuously expanding cross-domain featuring engineering system. In one example, a method may include one or more of storing predictive features in a cross-domain data store, the predictive features previously used in machine learning modeling in a plurality of different domains, receiving data of an asset included in a target domain and information about an evaluation attribute associated with the asset in the target domain, determining a predictive feature in the received data based on a previously used predictive feature stored in the cross-domain data store which is associated with a machine learning model in a different domain and the evaluation attribute, and outputting the determined predictive feature for display via a user interface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GENERAL ELECTRIC COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Graf, Alexander San Ramon, US 32 23
Wu, Siyu San Ramon, US 6 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 17, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 17, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00