Combustion burner and boiler equipped with the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10677457
APP PUB NO 20180195715A1
SERIAL NO

15736108

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion burner includes a plurality of splitters (5), (6), (7) configured to divide a fuel gas flow by a widened portion where a width of the widened portion increases as the widened portion extends in the direction of the fuel gas flow. The splitters include: slitted splitters (5), (6) configured to slits (SL) at a downstream end in the fuel gas flow; and non-slitted splitters (7) configured to adjacently to the slitted splitters (5), (6), each of the non-slitted splitters (7) configured to the widened portion at a downstream end in the fuel gas flow, and configured to a fixed width in a direction of the longitudinal axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI HITACHI POWER SYSTEMS, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Naofumi Yokohama, JP 12 55
Domoto, Kazuhiro Yokohama, JP 23 64
Kasai, Jun Yokohama, JP 25 75
Matsumoto, Keigo Tokyo, JP 59 280
Tanaka, Ryuichiro Yokohama, JP 28 249
Tominaga, Yukihiro Tokyo, JP 6 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 9, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00