Blowout preventer system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11459844
APP PUB NO 20210062606A1
SERIAL NO

17002118

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blowout preventer (BOP) for controlling pressure within a wellbore includes a body having a front side and a back side, the front side being opposite the back side. The BOP also includes a door opening extending through the front side. The BOP further includes an operator opening extending through the body, perpendicular to the door opening. The BOP includes an outlet extending from an inner cavity of the body through the back side, the inner cavity being fluidly coupled to both the outlet and the door opening. The BOP also includes a ram passage forming at least a portion of the inner cavity, wherein the ram passage is arranged substantially perpendicular to the door opening.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYDRIL USA DISTRIBUTION, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deluna, Ramon Houston, US 4 7
Moya, Ronny Houston, US 4 7
Yendell, Elliot Houston, US 4 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00