Apparatus and methods for a multi-panel UE to convey a blackout period

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11330467
SERIAL NO

16804851

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There may be a gap between the time a beam pair link (BPL) impacted by a beam failure (BF) event is deactivated and the time a replacement BPL is activated and becomes fully functional at a UE. The gap may be called a blackout period. A base station may not know the blackout period and may continue transmitting to the UE on the impacted BPL during the blackout period. This may result in a transmission failure. Disclosed herein are apparatus and methods for determining a blackout period associated with a beam failure (BF) event and communicating a blackout indication to a base station, the blackout indication including the blackout period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bai, Tianyang Bridgewater, US 428 680
Cezanne, Juergen Ocean Township, US 336 3083
Li, Junyi Chester, US 3155 27892
Luo, Tao San Diego, US 5001 28987
Raghavan, Vasanthan West Windsor Township, US 340 1064
Ryu, Jung Ho Fort Lee, US 422 806
Venugopal, Kiran Raritan, US 260 421

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00