Method and apparatus for reselecting cell in wireless communication system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11496931
APP PUB NO 20210176674A1
SERIAL NO

17118437

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method, performed by a terminal in a wireless communication system, includes: transmitting, to a first cell, capability information of the terminal including information on whether the terminal supports plurality of cell reselection priorities (CRPs); receiving, from the first EUTRAN cell, a radio resource control (RRC) Connection Release message including an alternativeCRPindication parameter indicating to apply CRP broadcast in system information, based on the capability information of the terminal; transitioning to an RRC idle mode or an RRC inactive mode based on the RRC Connection Release message, and camping on a second cell; receiving, from the second cell, system information; and determining, based on the system information, whether to apply a first CRP for an inter-RAT frequency or a second CRP for at least one EUTRAN frequency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Sangyeob Suwon-si, KR 120 145
Kim, Soenghun Suwon-si, KR 816 4484
Van, Der Velde Himke Suwon-si, KR 325 3478

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00