Drying rack

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11802366
APP PUB NO 20220298715A1
SERIAL NO

17700028

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A drying rack includes a base slab and elongated members having a first end and a second end. The second end is bifurcated with a first branch and a second branch. The elongated members have a stored position, with a second end of each of the elongated members inserted into a slot in the base slab with the first branch engaging a first face of the base slab, the second branch engaging a second face of the base slab and the first end of each elongated member maintained in the slot by friction. The elongated members have an operative position, with the elongated members arranged in an upright orientation relative to first face of the base slab. When the elongated members are inserted into openings in the base slab, the bifurcated second end is too large to pass through the openings.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bickerton, Brett D Nanoose Bay, CA 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00