Spring-actuated electrical connector for high-power applications

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11223150
APP PUB NO 20200395702A1
SERIAL NO

16908646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an electrical connector assembly for use in a high-power application, such as with motor vehicle electronics, that exposes the connector assembly to elevated temperatures and thermal cycling. The connector assembly includes a first electrically conductive connector formed from a first material, an internal spring member formed from a second material residing within the first connector, and a second electrically conductive connector with a receptacle dimensioned to receive both the first connector and the spring member to define a connected position, wherein the connector assembly withstands the elevated temperatures and thermal cycling resulting from the high-power application. To maintain the first and second connectors in the connected position, the spring arm of the spring member exerts an outwardly directed force on the contact beam of the first connector to outwardly displace the contact beam into engagement with an inner surface of the receptacle of the second connector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROYAL PRECISION PRODUCTS, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pavlovic, Slobodan Novi, US 90 1686
Zeidan, Mohamad Bloomfield Hills, US 30 384

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 11, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 11, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 11, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00