Apparatus, compositions, and methods for making solid methane gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11873460
APP PUB NO 20230374404A1
SERIAL NO

17746870

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed to a process that produces solid methane gas that is stable at room temperature such that the solid methane gas is capable of storage and shipment without specialized equipment. The process includes an apparatus for preparing solid methane gas, a method for using the apparatus, a method for preparing mixtures for use with the apparatus and resulting compositions. Solid methane gas is obtained by using a sophisticated apparatus and solid methane gas complexes having many different ingredients and ingenious methods. Methane gas flows through the sophisticated apparatus to be cooled and ultimately mixed with the solid methane bed complex at subzero Celsius conditions to create solid methane that is stable at room temperature. This solid methane is capable of being turned back into methane gas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Behramand, Simak Irvine, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00