Method for controlling or regulating a closing mechanism of a moulding machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11931942
APP PUB NO 20180169922A1
SERIAL NO

15840784

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a method for controlling or regulating a closing mechanism of a moulding machine, a first trajectory for the controlled or regulated movement of the movable platen is calculated using a first algorithm based on operator inputs relating to the desired movement of the movable platen, and the movable platen is moved in a controlled or regulated manner at least once according to the first trajectory. At least one dynamic or kinematic variable of the closing mechanism is measured during at least one of the movements of the movable platen according to the first trajectory, and an estimate of at least one parameter value is generated based on the measurement. A second trajectory for the controlled or regulated movement of the movable platen is calculated based on the estimate, and the movable platen is moved in a controlled or regulated manner according to the second trajectory.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ENGEL AUSTRIA GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kilian, Friedrich Johannes Neuhofen, AT 5 1
Springer, Klemens Leonding, AT 5 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00