Backside capacitor techniques

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11404534
APP PUB NO 20200411636A1
SERIAL NO

16853927

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Some embodiments relate to a semiconductor structure including a semiconductor substrate having a frontside surface and a backside surface. An interconnect structure is disposed over the frontside surface. The interconnect structure includes a plurality of metal lines and vias that operably couple semiconductor transistor devices disposed in or on the frontside surface of the semiconductor substrate to one another. A trench is disposed in the backside surface of the semiconductor substrate. The trench is filled with an inner capacitor electrode, a capacitor dielectric layer overlying the inner capacitor electrode, and an outer capacitor electrode overlying the capacitor dielectric layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kao, Min-Feng Chiayi, TW 140 738
Lin, Hsing-Chih Tainan, TW 69 221
Liu, Jen-Cheng Hsin-Chu, TW 393 3554
Yaung, Dun-Nian Taipei, TW 564 6019

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 2, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00