Metal-air battery and method of using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11133565
SERIAL NO

16482960

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal-air battery is comprised by a metal-air battery unit having a plurality of juxtaposed metal-air battery cells with a small number of components and a simple structure for injection of the electrolytic solution into each cell. Each metal-air battery cell has an air electrode, a metal electrode arranged to face the air electrode, and a casing configured to support the air electrode and the metal electrode. Each casing includes an air chamber and a liquid chamber. Each air chamber has an upper part opened to the outside. The casing has a liquid feeding port communicating with the liquid chamber for admitting an electrolytic solution when the metal-air battery unit is lowered into a container of electrolytic solution.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJIKURA COMPOSITES INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amamori, Yuka Saitama, JP 3 4
Narita, Tsutomu Saitama, JP 11 18
Sakama, Hiroshi Saitama, JP 15 147
Takahashi, Masaki Saitama, JP 343 2612

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00