Ultra high performance concrete voided slab panels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11168476
SERIAL NO

16802183

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ultra high performance concrete (UHPC) voided slab panel may include a top slab including a top skin and a bottom slab including a bottom skin. The top slab and the bottom slab may be joined at a joint filled with a joint material and positioned a select height within the UHPC voided slab panel. The top slab and the bottom slab may be joined via a connector assembly. The panel may include least two ribs defining at least one void accessible via at least one opening through an exterior surface of the UHPC voided slab panel. The UHPC voided slab panel may be fabricated from UHPC and a plurality of embedded prestressing strands, and may be configured to meet select strength requirements that are greater than select strength requirements for conventional precast concrete without reinforcing bars being embedded within the UHPC voided slab panel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • E.CONSTRUCT.USA, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asaad, Micheal Omaha, US 1 3
Schipper, Bradley Valley, US 1 3
Tadros, Maher K Omaha, US 18 266

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 9, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 9, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 9, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00