Kit comprising components made from planar sheet material for forming forge table and forge pot, and valve component for selectively communicating airflow source and forge pot

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11198174
APP PUB NO 20200306819A1
SERIAL NO

16827983

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A kit for forming a forge table and a forge pot for use therewith to carry a fuel for combustion so as to generate heat for heating a metallic workpiece. The forge table includes a tabletop with a central opening for receiving the forge pot. The forge pot includes a container for supporting the fuel and an air chamber fluidically communicated with the container and including an opening for fluidic communication with an external airflow source which generates an airflow for subsequent conveyance to the container for combusting the fuel. Each kit comprises interconnectable components made from rigid non-combustible sheet material. The airflow source is mounted in fluidic communication with the chamber and there is provided an intermediary valve component supported on the same mounting pegs carrying the source that is movably supported on the pegs so as to be operable to control passage of the airflow to the chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CLOVERDALE FORGE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jenkins, Matthew T St. Andrews, CA 1 0
Rudolph, Karen M St. Andrews, CA 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00