Storage device, multi-component device and method of controlling operation of the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11971764
APP PUB NO 20230096935A1
SERIAL NO

18074615

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A storage device includes a solid state drive (SSD), a field programmable gate array (FPGA), a power sensor and a global controller. The SSD stores data and receives power through a power rail connected to a host device. The FPGA processes data read from the SSD or data to be stored in the SSD and receives power through the power rail. The power sensor is connected to the power rail and generates a measured power value corresponding to a total power consumed by the SSD and the FPGA by measuring the total power. The global controller determines one of the SSD and the FPGA as a priority component operating with a fixed performance and determines the other of the SSD and the FPGA as a non-priority component operating with a variable performance in a priority mode based on power control information provided from the host device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Seunghyun Gunpo-si, KR 8 1
Lee, Hyuk Seongnam-si, KR 85 1893
Lee, Yongin Suwon-si, KR 8 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00