Electrical panel with distributed energy resources compartment and pre-wiring for solar inverter connection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11764552
APP PUB NO 20220302686A1
SERIAL NO

17831871

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A distributed energy resources compartment for an electrical panel is pre-wired for installation of a photovoltaic system for a residence. The compartment is mounted on a back plate in the interior of an electrical cabinet. A pre-wired connection within the compartment is configured to connect to a solar circuit breaker within the electrical cabinet, connected as a back-feed circuit breaker to an electrical panel. An opening on a backside of the compartment adjacent to the back plate of the electrical cabinet, is configured to receive connections within the compartment from a solar inverter, through the back plate of the electrical cabinet when the solar inverter is mounted to the back plate of the electrical cabinet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SCHNEIDER ELECTRIC USA, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Phillips, Timothy Murfreesboro, US 20 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00