Power supply control device, switching power supply, and electronic apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11437842
APP PUB NO 20200303941A1
SERIAL NO

16824813

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply control device includes a charge circuit, a detection circuit, and a charge control circuit. The charge circuit charges a capacitor coupled to a power supply voltage node based on a full-wave rectified voltage. The charge control circuit enables a charge mode of the charge circuit when the detection circuit detects that a power supply voltage is less than a first threshold voltage. The charge control circuit disables the charge mode when the detection circuit detects that the power supply voltage reached a second threshold voltage. The charge control circuit sets a charge capacity of the charge circuit in a second charge mode period according to a length of a first charge mode period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Kanji Chino, JP 9 136
Inoue, Katsumi Matsumoto, JP 47 454

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00