Integrated heat management systems and processes for adsorbed natural gas storage facilities

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11896928
APP PUB NO 20230241544A1
SERIAL NO

18299741

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for heat exchange during gas adsorption and desorption cycling, one method including removing heat from an adsorbent material during gas adsorption to the adsorbent material; storing the removed heat for later use during desorption of gas from the adsorbent material; heating the adsorbent material during desorption of gas from the adsorbent material using at least a portion of the removed heat; and recycling heat during the step of heating to prepare a working fluid for the step of removing heat via temperature reduction of the working fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAUDI ARABIAN OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alhashim, Mohammed Dhahran, SA 2 2
Bahamdan, Ahmad Dhahran, SA 8 5
Migliore, Calogero Dhahran, SA 3 15
Othman, Rashid Dhahran, SA 6 10
Wang, Yuguo Dhahran, SA 57 151

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00