Semiconductor package comprising molding compound having extended portion and manufacturing method of semiconductor package

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10529593
APP PUB NO 20190333782A1
SERIAL NO

15964092

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor package manufacturing method thereof are provided. The semiconductor package includes a high-power device die, a redistribution structure, a heat dissipation module and a molding compound. The high-power device die has a front side and a back side opposite to the front side. The redistribution structure is disposed at the front side. The heat dissipation module is in direct contact with the back side. The molding compound is disposed between the redistribution structure and the heat dissipation module, and surrounding the high-power device die. The molding compound has a body portion and an extended portion. An interface between the body portion and the heat dissipation module is substantially parallel to the back side of the high-power device die. A thickness of the extended portion is greater than a thickness of the body portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Yu-Hsiang Hsinchu, TW 182 623
Kuo, Hung-Jui Hsinchu, TW 370 1623
Wang, Po-Han Hsinchu, TW 55 136

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00