Gate driving circuit and display device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11488543
SERIAL NO

17560127

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gate driving circuit includes a first gate driving circuit and a second gate driving circuit, wherein the m number of first clock signals input to the first gate driving circuit includes an (n+1)-th clock signal and an (n+k)-th clock signal, and the m number of second clock signals input to the second gate driving circuit includes an (n+2)-th clock signal and an (n+k+1)-th clock signal, where the n is any integer, and the k is a natural number of 3 or more, a high level voltage duration of the (n+1)-th clock signal and a high level voltage duration of the (n+k)-th clock signal do not overlap, and a high level voltage duration of the (n+2)-th clock signal and a high level voltage duration of the (n+k+1)-th clock signal do not overlap.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG DISPLAY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, KwangSoo Seoul, KR 29 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 1, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 1, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00