Crop growth system including a seeder and associated harvester

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11871698
APP PUB NO 20190289774A1
SERIAL NO

16360743

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for growing plants includes both a seeder and a harvester both of which include arrangements for singulating the seeds and for measuring parameters of the seeds while singulated. This can be used for seeding selected seeds and for harvesting particular plants. The system operates by correlating information from the individual seeded seeds and from the harvested seeds in respect of a particular location on the growth medium and may include information relating the growth medium at the location. The location can be determined by seeding the plants in patterns which can be detected by a reader on the harvester. The system can be used to control selection of seeds to take into account soil conditions at the plant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 10691976 CANADA LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pacak, John Winnipeg, CA 11 42
Prystupa, David Pinawa, CA 14 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00