Combining prerecorded and live performances in a vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11902767
SERIAL NO

17644547

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In some embodiments, methods and systems for combining a prerecorded performance with a live performance within a space (such as a vehicle) are disclosed. A first performance (which may be a prerecorded performance) may be started within the space, and a second performance (such as a live performance) may subsequently be initiated within the space as well. The second performance may be detected, and based upon the detection, one or more volume parameters of the first performance may be modified. One or more properties of the second performance may also be modified, and the modified first performance may then be combined with the modified second performance to create a combined performance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HARMAN INTERNATIONAL INDUSTRIES, INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ludwig, Chris Bloomfield Hills, US 30 101
Trestain, Christopher Michael Livonia, US 35 95
Willis, Maxwell B Detroit, US 8 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00