Process for producing composite material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11896956
SERIAL NO

16966144

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process is disclosed comprising, providing a source of graphene, providing a particulate material, dispersing a mixture of the source of graphene and the particulate material in a first dispersion fluid to form a dispersion mixture, and providing a source of a base in the first dispersion fluid, thereby causing the source of graphene and particulate material in the dispersion mixture to interact forming a composite. The particulate material is preferably titanium dioxide comprising anatase and/or rutile which provides an effective photocatalytic composite. Also disclosed is apparatus to remove pollutants from fluids using the photocatalytically active material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANAPHITE LIMITEDSCIENCE CREATES ST PHILIPS CENTRAL ALBERT ROAD BRISTOL BS2 0XJ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burrow, Samuel Bristol, GB 1 0
Hewitt, Alexander Bristol, GB 1 0
Mogort-Valls, Elena Bristol, GB 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00