Separation systems, elements, and methods for separation utilizing stacked membranes and spacers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11759751
APP PUB NO 20210339201A1
SERIAL NO

17375932

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An example separation system includes a stack of membrane plate assemblies. An example membrane plate assembly may include membranes bonded to opposite sides of a spacer plate. The spacer plate may include a first opening in fluid communication with a region between the membranes, and a second opening in fluid communication with a region between membrane plate assemblies. Adjacent membrane plate assemblies in the stack may have alternating orientations such that bonding areas for adjacent membranes in the stack may be staggered. Accordingly, two isolated flows may be provided which may be orthogonal from one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PORIFERA INC3507 BREAKWATER AVE HAYWARD CA 94545

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bakajin, Olgica Berkeley, US 29 715
Benton, Charles Berkeley, US 20 301

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00