Electrical connector

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10547136
APP PUB NO 20190214761A1
SERIAL NO

16242381

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical connector includes an insulating body and multiple terminals. The insulating body has multiple terminal holes running through an upper surface and a lower surface thereof. Each terminal has a connecting portion correspondingly located in a corresponding terminal hole, a conducting portion extending from the connecting portion, an elastic arm formed by bending upward and extending from the connecting portion upward out of the corresponding terminal hole, and a contact portion bending upward and extending from the elastic arm. When a chip module is pressed downward, a bottom surface of each conductive sheet of a circuit board downward abuts a top surface of the contact portion, and the elastic arm deforms downward. The contact portion, the elastic arm, the connecting portion and the conducting portion are integrally formed. A thickness of the connecting portion is greater than a thickness of the contact portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LOTES CO., LTD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ho, Chien Chih Keelung, TW 40 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00