Semiconductor device and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11823952
APP PUB NO 20230114920A1
SERIAL NO

18079998

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a substrate including an active pattern, a first interlayer dielectric layer on the substrate, the first interlayer dielectric layer including a recess on an upper portion thereof, and a lower connection line in the first interlayer dielectric layer, the lower connection line being electrically connected to the active pattern, and the lower connection line including a conductive pattern, the recess of the first interlayer dielectric layer selectively exposing a top surface of the conductive pattern, and a barrier pattern between the conductive pattern and the first interlayer dielectric layer, the first interlayer dielectric layer covering a top surface of the barrier pattern.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Sanghoon Hwaseong-si, KR 51 494
Han, Kyu-Hee Hwaseong-si, KR 43 443
Lee, Woojin Hwaseong-si, KR 157 41084
Seo, Hoon Seok Suwon-si, KR 8 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00