Imaging system with control member for conveyance path and developing roller having a peeling pole

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11487219
SERIAL NO

17414810

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An imaging system includes: a housing including a developing chamber, a developing roller located in the developing chamber to transport a developer and spaced apart from the housing; a conveyance path extending along at least part of a periphery of the developing roller in order to form a flow of air including the developer; and a control member. The developing roller includes a peeling pole at a fixed position with respect to the housing, to discharge the developer. The control member is located along the conveyance path in proximity to the peeling pole of the developing roller, to reduce a flow rate of the air flowing through the conveyance path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwata, Naoya Yokohama, JP 31 267
Kato, Yuya Yokohama, JP 48 171
Yamada, Takayuki Yokohama, JP 273 2387

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 1, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 1, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00