Structure for connecting board and connector, board, and method for connecting board and connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10148027
APP PUB NO 20180138615A1
SERIAL NO

15812765

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structure that includes a board and a connector secured to an end portion of the board. The board has a first dielectric layer, a signal pattern that is provided on the top face of the first dielectric layer, a first ground layer that is provided under the first dielectric layer and forms part of a signal transmission circuit in conjunction with the signal pattern, and a plating film formed on an end face of the end portion of the board in an area located directly under the signal pattern and includes an end face of the first ground layer. The connector has a center conductor, an outer conductor, and securing portions that secure the connector to an end portion of the board. When the connector is secured, the center conductor comes in contact with the signal pattern and the plating film comes in contact with the outer conductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HIROSE ELECTRIC CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsumoto, Teppei Tokyo, JP 12 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00