Power storage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11848463
SERIAL NO

17499869

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Each of a plurality of power storage cells includes an top surface provided with an electrode terminal, a bottom surface opposite to the top surface, and a side surface contiguous to the top surface and the bottom surface. A case includes a main body provided with an opening on the side surface side of the plurality of power storage cells, and a cover provided over the opening. The case has a first inner side surface and a second inner side surface each facing the side surfaces of the plurality of power storage cells. A power storage device includes biasing means for biasing the plurality of power storage cells toward the second inner side surface of the case, the biasing means being provided between the first inner side surface of the case and the plurality of power storage cells.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRIME PLANET ENERGY & SOLUTIONS INCTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morishita, Taijyu Kasai, JP 9 0
Okada, Wataru Kobe, JP 136 2126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00